Portobello America Porcelain Tile Plant

Portobello America Porcelain Tile Plant

portobello tile  About Project PORTOBELLO AMERICA PORCELAIN TILE PLANT Baxter, Tenessee Contract Amount – $5,770,151 95-acre site 936,000 square foot facility 37 acres of clearing and grubbing 550,000 cubic yards of earthwork 10,500 linear feet of storm drain...
Mazda Toyota Manufacturing, U.S. Sitework

Mazda Toyota Manufacturing, U.S. Sitework

Mazda Toyota Manufacturing, U.S. Sitework About Project Mazda Toyota Manufacturing, U.S. Sitework Huntsville, Alabama 1,300-acre site 6 million cubic yards of earthwork. Completed in 5 months and ahead of schedule 8,000 tons of rip rap 505,000 tons of aggregate base...
Big River Steel

Big River Steel

Big River Steel About Project Big River Steel Osceola, Arkansas 1,200-acre site 1.2 million cubic yards of earthwork 1.2 million square feet of building pad construction Drainage ditches, drainage piping, and retention ponds Soil stabilization for 15 miles of roads...
Nissan North America Logistics Center

Nissan North America Logistics Center

Nissan North America Logistics Center About Project NISSAN NORTH AMERICA LOGISTICS CENTER Canton, Mississippi Contract Amount – $9,640,000 1.5 million square foot building pad and parking areas 1.4 million cubic yards of earthwork 7,000 linear feet of storm...
Hankook Tire

Hankook Tire

Hankook Tire About Project HANKOOK TIRE Clarksville, Tennesse Contract Amount – $18,000,000 4.5 million cubic yards of earthwork in 6 months 2 miles of temporary gravel roads 16,000 linear feet of water, sanitary sewer, and gas utilities 7,000 linear feet of...