Big River Steel
About Project
Big River Steel
Osceola, Arkansas
1,200-acre site- 1.2 million cubic yards of earthwork
- 1.2 million square feet of building pad construction
- Drainage ditches, drainage piping, and retention ponds
- Soil stabilization for 15 miles of roads and railroads capped with 6” of stone
- 600,000 cubic yards of structure excavation for building footings and foundations
- 53 foot deep basement excavations
- Earthwork operations and support for over 100 miles of underground piping and duct banks
- Ramp construction on the Mississippi River to support offloading materials from barges
![BRS_MM1_090523_665](https://eutaw.com/eutaw_com/wp-content/uploads/2024/06/BRS_MM1_090523_665-scaled.jpg)
![BRS_MM1_090523_578](https://eutaw.com/eutaw_com/wp-content/uploads/2024/06/BRS_MM1_090523_578-scaled.jpg)
![BRS_MM1_090523_665](https://eutaw.com/eutaw_com/wp-content/uploads/2024/06/BRS_MM1_090523_665-1-scaled.jpg)
![BRS_MM1_090523_597](https://eutaw.com/eutaw_com/wp-content/uploads/2024/06/BRS_MM1_090523_597-scaled.jpg)
Related Projects
![Itawamba County](https://eutaw.com/eutaw_com/wp-content/uploads/2022/01/Itawamba-1346-510x382.jpg)
![Lake Harbor Drive](https://eutaw.com/eutaw_com/wp-content/uploads/2019/09/LakeHarbor-8373-510x382.jpg)
![Mack Hatcher Parkway](https://eutaw.com/eutaw_com/wp-content/uploads/2019/03/MackHatcher-6539-1-510x382.jpg)
![Highway 412 Bypass](https://eutaw.com/eutaw_com/wp-content/uploads/2019/02/DJI_0268.jpg)
![State Route 9 Design-Build Project](https://eutaw.com/eutaw_com/wp-content/uploads/2018/10/state-route-2-510x382.jpg)
![Byram-Clinton Corridor](https://eutaw.com/eutaw_com/wp-content/uploads/2019/02/Eutaw-Byram-Clinton-1535-510x382.jpg)
![HIGHWAY 6](https://eutaw.com/eutaw_com/wp-content/uploads/2019/02/IMG_4491-hwy6-510x382.jpg)
![Duplex Road](https://eutaw.com/eutaw_com/wp-content/uploads/2019/02/DuplexRoad-6540-new-1-510x382.jpg)
![TALLAHATCHIE BRIDGE REPLACEMENT](https://eutaw.com/eutaw_com/wp-content/uploads/2018/12/IMG_0872-510x382.jpg)