BYRAM / CLINTON CORRIDOR
About Project
BYRAM / CLINTON CORRIDOR
Hinds County, Mississippi
- Contract Amount – $19,425,000
- 3.5 miles of
four lane road and bridge construction - 100 acres of clearing and grubbing
- 200,000 cubic yards of earthwork
- 30,000 linear feet of storm drainage
- 3 double barrel concrete box culverts and 2 concrete bridges
- 69,000 linear feet of curb and gutter
- 68,000 tons of asphalt
- Water utilities and traffic signals
![](https://eutaw.com/eutaw_com/wp-content/uploads/2019/02/Eutaw-Byram-Clinton-1519-new.jpg)
![](https://eutaw.com/eutaw_com/wp-content/uploads/2019/02/Eutaw-Byram-Clinton-1535.jpg)
Related Projects
![Itawamba County](https://eutaw.com/eutaw_com/wp-content/uploads/2022/01/Itawamba-1346-510x382.jpg)
![Lake Harbor Drive](https://eutaw.com/eutaw_com/wp-content/uploads/2019/09/LakeHarbor-8373-510x382.jpg)
![Mack Hatcher Parkway](https://eutaw.com/eutaw_com/wp-content/uploads/2019/03/MackHatcher-6539-1-510x382.jpg)
![Highway 412 Bypass](https://eutaw.com/eutaw_com/wp-content/uploads/2019/02/DJI_0268.jpg)
![State Route 9 Design-Build Project](https://eutaw.com/eutaw_com/wp-content/uploads/2018/10/state-route-2-510x382.jpg)
![Byram-Clinton Corridor](https://eutaw.com/eutaw_com/wp-content/uploads/2019/02/Eutaw-Byram-Clinton-1535-510x382.jpg)
![HIGHWAY 6](https://eutaw.com/eutaw_com/wp-content/uploads/2019/02/IMG_4491-hwy6-510x382.jpg)
![Duplex Road](https://eutaw.com/eutaw_com/wp-content/uploads/2019/02/DuplexRoad-6540-new-1-510x382.jpg)
![TALLAHATCHIE BRIDGE REPLACEMENT](https://eutaw.com/eutaw_com/wp-content/uploads/2018/12/IMG_0872-510x382.jpg)