State Route 9 Design-Build Project
About Project
State Route 9 Design-Build Project
Pontotoc, Mississippi
- Contract Amount – $87,500,000
- 550 acres of clearing and grubbing
- 7.5 million cubic yards of earthwork
- 15,000 linear feet of drainage pipe
- 160,000 tons of asphalt
- Completed 5 months ahead of schedule
![](https://eutaw.com/eutaw_com/wp-content/uploads/2018/10/state-route-9.jpg)
Related Projects
![Itawamba County](https://eutaw.com/eutaw_com/wp-content/uploads/2022/01/Itawamba-1346-510x382.jpg)
![Lake Harbor Drive](https://eutaw.com/eutaw_com/wp-content/uploads/2019/09/LakeHarbor-8373-510x382.jpg)
![Mack Hatcher Parkway](https://eutaw.com/eutaw_com/wp-content/uploads/2019/03/MackHatcher-6539-1-510x382.jpg)
![Highway 412 Bypass](https://eutaw.com/eutaw_com/wp-content/uploads/2019/02/DJI_0268.jpg)
![State Route 9 Design-Build Project](https://eutaw.com/eutaw_com/wp-content/uploads/2018/10/state-route-2-510x382.jpg)
![Byram-Clinton Corridor](https://eutaw.com/eutaw_com/wp-content/uploads/2019/02/Eutaw-Byram-Clinton-1535-510x382.jpg)
![HIGHWAY 6](https://eutaw.com/eutaw_com/wp-content/uploads/2019/02/IMG_4491-hwy6-510x382.jpg)
![Duplex Road](https://eutaw.com/eutaw_com/wp-content/uploads/2019/02/DuplexRoad-6540-new-1-510x382.jpg)
![TALLAHATCHIE BRIDGE REPLACEMENT](https://eutaw.com/eutaw_com/wp-content/uploads/2018/12/IMG_0872-510x382.jpg)