LAKE HARBOR DRIVE EXTENSION
Ridgeland, Mississippi
- Contract Amount – $14,700,000
- Four (4) lane road & bridge construction over I-55 with sidewalks and bike path
- 200,000 cubic yards of earthwork
- 6,600 linear feet of storm drain piping
- 2,385 linear feet of steel piling
- 5,300 linear feet of pre-stressed concrete beams
- 2,000 cubic yard of bridge concrete
![](https://eutaw.com/eutaw_com/wp-content/uploads/2019/09/LakeHarbor-8309.jpg)
![](https://eutaw.com/eutaw_com/wp-content/uploads/2019/09/LakeHarbor-8408.jpg)
![](https://eutaw.com/eutaw_com/wp-content/uploads/2019/09/LakeHarbor-NightBeams-0027.jpg)
![](https://eutaw.com/eutaw_com/wp-content/uploads/2019/09/LakeHarbor-NightBeams-0054.jpg)
Related Projects
![Itawamba County](https://eutaw.com/eutaw_com/wp-content/uploads/2022/01/Itawamba-1346-510x382.jpg)
![Lake Harbor Drive](https://eutaw.com/eutaw_com/wp-content/uploads/2019/09/LakeHarbor-8373-510x382.jpg)
![Mack Hatcher Parkway](https://eutaw.com/eutaw_com/wp-content/uploads/2019/03/MackHatcher-6539-1-510x382.jpg)
![Highway 412 Bypass](https://eutaw.com/eutaw_com/wp-content/uploads/2019/02/DJI_0268.jpg)
![State Route 9 Design-Build Project](https://eutaw.com/eutaw_com/wp-content/uploads/2018/10/state-route-2-510x382.jpg)
![Byram-Clinton Corridor](https://eutaw.com/eutaw_com/wp-content/uploads/2019/02/Eutaw-Byram-Clinton-1535-510x382.jpg)
![HIGHWAY 6](https://eutaw.com/eutaw_com/wp-content/uploads/2019/02/IMG_4491-hwy6-510x382.jpg)
![Duplex Road](https://eutaw.com/eutaw_com/wp-content/uploads/2019/02/DuplexRoad-6540-new-1-510x382.jpg)
![TALLAHATCHIE BRIDGE REPLACEMENT](https://eutaw.com/eutaw_com/wp-content/uploads/2018/12/IMG_0872-510x382.jpg)