State Route 76
New Alignment
About Project
state route 76 itawamba county
Fulton, Mississippi
- Contract Amount – $80,956,326
- 9.13 miles of new 4-lane highway
- 530 acres of clearing and grubbing
- 2.8 million cubic yards of unclassified excavation
- 1.6 millin cubic yards of borrow excavation
- 360,000 cubic yards of excess excavation
- 253,200 tons of granular material
- 283,200 square yards of soil-lime mixing
- 367,635 square yards of soil-cement mixing
- 14,000 feet of storm drainage
- 8 bridges
- 4 box culverts
- 2 box bridges
- 151,000 tons of asphalt paving
![Itawamba-1480](https://eutaw.com/eutaw_com/wp-content/uploads/2022/01/Itawamba-1480-scaled.jpg)
![Itawamba-1435](https://eutaw.com/eutaw_com/wp-content/uploads/2022/01/Itawamba-1435-scaled.jpg)
Related Projects
![Itawamba County](https://eutaw.com/eutaw_com/wp-content/uploads/2022/01/Itawamba-1346-510x382.jpg)
![Lake Harbor Drive](https://eutaw.com/eutaw_com/wp-content/uploads/2019/09/LakeHarbor-8373-510x382.jpg)
![Mack Hatcher Parkway](https://eutaw.com/eutaw_com/wp-content/uploads/2019/03/MackHatcher-6539-1-510x382.jpg)
![Highway 412 Bypass](https://eutaw.com/eutaw_com/wp-content/uploads/2019/02/DJI_0268.jpg)
![State Route 9 Design-Build Project](https://eutaw.com/eutaw_com/wp-content/uploads/2018/10/state-route-2-510x382.jpg)
![Byram-Clinton Corridor](https://eutaw.com/eutaw_com/wp-content/uploads/2019/02/Eutaw-Byram-Clinton-1535-510x382.jpg)
![HIGHWAY 6](https://eutaw.com/eutaw_com/wp-content/uploads/2019/02/IMG_4491-hwy6-510x382.jpg)
![Duplex Road](https://eutaw.com/eutaw_com/wp-content/uploads/2019/02/DuplexRoad-6540-new-1-510x382.jpg)
![TALLAHATCHIE BRIDGE REPLACEMENT](https://eutaw.com/eutaw_com/wp-content/uploads/2018/12/IMG_0872-510x382.jpg)