US 82 Greenville bypass
About Project
US 82 Greenville Bypass SR 1 to Leland, MS
Greenville, Mississippi
- Contract Amount – $136,978,703
- 9 miles of 4-lane (grade, drain, bridge, and paving)
- 2,600,000 cubic yards of borrow excavation
- 56,000 cubic yards of unclassified excavation
- 125,000 tons of granular material
- 226,900 tons of crushed stone base
- 612,965 square yards of soil stabilization
- 186,800 tons of asphalt
- 9 box culverts
- 7 box bridges
- 9 bridges
- 130,500 cubic yards of filter material for storm drain/underdrain