US 82 Greenville bypass 

About Project

US 82 Greenville Bypass SR 1 to Leland, MS

Greenville, Mississippi

  • Contract Amount – $136,978,703
  • 9 miles of 4-lane (grade, drain, bridge, and paving)
  • 2,600,000 cubic yards of borrow excavation
  • 56,000 cubic yards of unclassified excavation
  • 125,000 tons of granular material
  • 226,900 tons of crushed stone base
  • 612,965 square yards of soil stabilization
  • 186,800 tons of asphalt
  • 9 box culverts
  • 7 box bridges
  • 9 bridges
  • 130,500 cubic yards of filter material for storm drain/underdrain