airbus
About Project
airbus South Outfall
Mobile, Alabama
- 3,760 linear feet of 84″ CLIV RCP at depth of 19 feet
- 11 ton joint pipe sections
- Bedded with 3.4 feet of 57 stone and backfilled with imported borrow material
- 50,000 cubic yards of unclassified excavation hauled off site
- 11 structures installed (8 feet wide x 11.5 feet long x 20 feet tall